In La Rochelle, ARKENOR carries out the regulatory acceptance measurements of buildings — air permeability (RE2020), acoustics, ventilation, energy performance certificate — as an independent third party, with compliant certificates.

Updated 21 July 2026

La Rochelle · New Aquitaine

Regulatory measurements & diagnostics in La Rochelle.

Prefecture of the Charente-Maritime engaged in a firm low-carbon trajectory, La Rochelle sees many clients and developers aiming for performance above the regulatory minima. This ambition shifts the focus of handover: measurement no longer serves only to certify compliance but to verify more demanding contractual commitments, on which the gap to calculation is costly. In La Rochelle and across the Charente-Maritime we carry out regulatory acceptance measurements, as an independent third party, with compliance certificates.

Our measurements

Six families of measurements & diagnostics in La Rochelle.

RE2020 air permeability testing

QUALIBAT 8711

Airtightness testing (Q4Pa-surf air permeability): an intermediate test at the weathertight-shell stage to correct defects before lining, and a regulatory RE2020 acceptance test on the finished building.

Acceptance acoustic testing

NF EN ISO 16283

Airborne sound insulation (DnT,A / DnT,A,tr), impact sound (L'nT,w), equipment noise and reverberation: verification of the NRA housing requirements and the ERP order, carried out as an independent third party.

RE2020 ventilation airflow testing

QUALIBAT 8741

Functional checking of ventilation systems (airflow rates, pressure drops, ductwork airtightness) required by RE2020 at the handover of new dwellings.

Housing and commercial energy performance certificate (DPE)

certified assessor

Legally binding energy performance certificate (DPE), issued by a certified assessor, for sale, letting and monitoring under the tertiary-sector decree.

Drone aerial inspection

DGAC drone pilot

Inspection of roofs and façades, aerial thermography, photogrammetry and mapping by drone (DGAC-registered drone pilot), on sites that are difficult to access.

Electromagnetic field (EMF) measurements

NF EN 50492

Low frequencies at 50 Hz (electric field kV/m, magnetic field µT) and radiofrequencies from 9 kHz to 300 GHz (V/m), following the UTE/NF C99-132 and ANFR protocols. A criterion recognised in HQE and NF Habitat certification.

Why ARKENOR

What the local competitor does not cover.

Independent third party

Acceptance measurements kept separate from design: an objective, enforceable certificate for the client.

Drone inspection (DGAC)

Aerial thermography and photogrammetry by a DGAC-registered drone pilot, for hard-to-reach sites in La Rochelle.

Upstream → downstream chain

From calculation (ARKEMEP) to measurement (ARKENOR) and independent third-party certification (IRICE, Cofrac 5-0655).

Coverage area

Measurements & diagnostics in La Rochelle and the surrounding area.

Our teams travel from Aix-en-Provence to La Rochelle and the neighbouring municipalities of the 17 department.

La Rochelle
Aytré
Périgny
Lagord
Châtelaillon-Plage
Rochefort

FAQ

FAQ, measurements & diagnostics in La Rochelle

Yes. ARKENOR conducts acceptance measurements (air permeability, acoustics, ventilation) as an independent third party, separate from the design engineering office, which guarantees the objectivity of the certificate towards the client/developer and the technical inspector.
Yes. RE2020 measurements are carried out under QUALIBAT 8711 (air permeability) and 8741 (ventilation system checking) qualifications, recognised for regulatory certificates at handover.
On-site measurements are scheduled according to the progress of the works and the location. An intermediate air permeability test is slotted in from the weathertight-shell stage; acceptance measurements are programmed before handover. We confirm the date once we receive the works programme and the drawings.
That is precisely the value of measuring before the snagging is cleared. A gap identified at this stage remains attributable and correctable: repair of leakage points, rebalancing of the ventilation network, treatment of a junction. After handover, the burden of proof and the cost of works shift to the client/developer. Our role as an independent third party is to produce a factual and enforceable finding, whatever the result, and not to validate a target out of complaisance.

Related services

ARKENOR also carries out in La Rochelle, as an independent third party:

A project in La Rochelle? Let's schedule your acceptance testing.