Green and blue network
Ecological continuities in planning

The green and blue network maps ecological continuities (corridors and reservoirs) that planning documents must preserve.

Green and blue network

The green and blue network maps ecological continuities (corridors and reservoirs) that planning documents must preserve. ARKENOR analyses continuities at project and territory scale to inform design and secure authorisations.

← Ecological expertise

Purpose

Habitats are not enough, connections between them matter.

A protected habitat surrounded by development slowly loses the species it holds, because populations that cannot exchange individuals decline. The green and blue network addresses that: it identifies reservoirs of biodiversity and the corridors linking them, and requires planning documents to preserve both.

For a project, this means the ecological question is not only what is on the site. A site of modest ecological value can carry a corridor whose interruption has effects well beyond its boundary, and that is assessed.

Application

It binds through planning documents, and through the project file.

Regional and local planning documents translate the network into mapped constraints, so the first check is documentary: what do the applicable documents say about this parcel. The second is field-based, because mapping at regional scale is coarse and a corridor's real position is established on the ground.

Maintaining permeability, hedgerows, unfenced margins, appropriate lighting, is typically a reduction measure, and restoring it can serve as an offset where it delivers a real gain.

Design

Permeability is built, not declared.

A corridor maintained on a plan and interrupted by a continuous fence, a kerb or a lighting scheme is not a corridor. Permeability depends on details that are decided late in design and easily lost in value engineering: gaps at ground level, unlit sections, hedgerow continuity across plot boundaries.

This is why connectivity commitments are among the measures a site ecologist verifies during works. The gap between the authorised drawing and the built result is where these measures are usually lost.

Going further

Related pages.

Ecological connectivity connects to these subjects.

Discuss your project

Engineering, environmental advisory and independent certification under one group, with a strict separation of roles.

Sans engagement · Réponse sous 48 h ouvrées · Données confidentielles